• Rubber Four Roll Calender
  • Rubber Four Roll Calender
  • Rubber Four Roll Calender
  • Rubber Four Roll Calender
  • Rubber Four Roll Calender
  • Rubber Four Roll Calender

Rubber Four Roll Calender

Warranty: 1 Year
Control Type: PLC
Automatic Grade: Automatic
Power Source: Electric
Type: Rubber Calender
Condition: New
Customization:
Gold Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Voltage
380V
Color
Green / Blue / etc
Weight
45t
Power(Kw)
210
Brand
Lanhang
Final Product Thickness
0.05-1mm
Roll Speed
6-60m/Min
Transport Package
Film Covering
Specification
SGS
Trademark
Lanhang
Origin
China
HS Code
84778000
Production Capacity
200 Set/Sets Per Year

Product Description

Rubber Four Roll Calender

Rubber Four Roll Calender

 Founded in 1992, Zhangjiagang Lanhang Machinery Co., Ltd. is a private enterprise integrating scientific research, production, marketing and service of plastic machinery into one complete whole. 
     Our "Lanhang" brand of planetary roll extruders, straining extruders, powerful horsepower dense mixers, mixing rolls, and high-speed mixers are the backbone of our company. 
     we sincerely welcome customers to cooperate with us to develop rewarding business partnerships.
Product Description
 
Features:
      1. long service life
       2. simple operation 
       3. good results
       4. east maintence
       5. convenient of worn-out parts
 
Application:
Mainly used for film,rigid sheet calendering

Main technical parameters 
 
 

Project / Model   
SY610x1900 SY610x2030 SY660x2500 SY710x2800
Roll specification (mm) 610x1900 610x2030 660x2500 710x2800
Layout of  the roll  The pour L type
Roll speed (m/min) 40-100 40-100 50-120 50-120
Final product thickness   (mm) 0.08-1 0.08-1 0.08-1 0.08-1
Rolled products Width    (mm) 1500 1600 2100 2300
Main motor power (kw) 200kw
(45kw 2 sets      55kw 2 sets)
260kw
(55kw2sets        75kw 2sets)
330kw         (75kw 2sets    90kw 2sets) 400kw         (90kw 2 sets   110kw 2 sets)

 
 
 
Packaging & Shipping
 
1. Payment: 30% by T/T as down payment money, balance (70%) by T/T before shipment.
2. Lead Time: 90 working days after receiving the down payment money.
3. Package: PE film, pallet at the bottom (if necessary).
Our Services
 
1. Warranty period: From the day of the use of the machine in the buyer's factory:
   (1) The mechanical Parts: 12 months
   (2)The electrical Parts: 6 months
 Rubber Four Roll CalenderRubber Four Roll CalenderRubber Four Roll CalenderRubber Four Roll Calender

2. Installations and Commissioning
  (1)Up to date commissioning has been made before shipment
  (2)Overseas Commissioning and charges:
0ne or two technicians will be sent to the buyer to guide the installation and commissioning of thequipment if the customer requests.
 Customers pay the charge of our technicians.
     1) Round-trip Airplane Tickets Rubber Four Roll CalenderRubber Four Roll CalenderRubber Four Roll CalenderRubber Four Roll Calender
     2) Charges of transportation, accommodation and communication
     3) The allowance of the technicians is USD 100 per day for one person.
     4) An interpreter is needed.
 
3 English manual, Figuration drawing, and footing drawings are provided

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
60
Year of Establishment
1996-04-29